Availability: | |
---|---|
Quantity: | |
Jedha
1. Low maintenance cost.
2. Environmental protection, recyclable.
3. Door, window, indoor partition fixed flexible
4. The steel structure is strong, durable and stable.
5. Steel components are resistant to termites and other destructive insects.
6. The service life is more than 50 years
7. Fast construction, convenient installation, convenient transportation.
Please inform us of the following information:
1. Size: long, wide, high, high eaves.
2. Doors and Windows: size, quantity.
3. Local climate: wind speed, snow load, floor load.
4. Wall and roof materials: sandwich board or steel plate.
5. Crane beam: Is a crane beam needed inside the steel structure? And its lifting weight.
6. Other requirements.
The components of the steel structure workshop are assembled into the frame on site, usually by bolting and sometimes using field welding. The installation process includes retest of anchor bolts, unloading of steel components, approach inspection, direct hoisting in place, temporary fastening of anchor bolts, temporary fastening and stabilization of cable wind rope, adjustment of steel column axis position and verticality, fastening and welding of bolts and column foot platen, etc
1. Low maintenance cost.
2. Environmental protection, recyclable.
3. Door, window, indoor partition fixed flexible
4. The steel structure is strong, durable and stable.
5. Steel components are resistant to termites and other destructive insects.
6. The service life is more than 50 years
7. Fast construction, convenient installation, convenient transportation.
Please inform us of the following information:
1. Size: long, wide, high, high eaves.
2. Doors and Windows: size, quantity.
3. Local climate: wind speed, snow load, floor load.
4. Wall and roof materials: sandwich board or steel plate.
5. Crane beam: Is a crane beam needed inside the steel structure? And its lifting weight.
6. Other requirements.
The components of the steel structure workshop are assembled into the frame on site, usually by bolting and sometimes using field welding. The installation process includes retest of anchor bolts, unloading of steel components, approach inspection, direct hoisting in place, temporary fastening of anchor bolts, temporary fastening and stabilization of cable wind rope, adjustment of steel column axis position and verticality, fastening and welding of bolts and column foot platen, etc